CR110 · Tampines North–Defu Tunnel
Central partition wall & top slab formwork trolley

Project background
CR110 forms part of Singapore’s Cross Island Line Phase 1. The contract covers the tunnel connection between Tampines North and Defu stations and was awarded by the Land Transport Authority to Nishimatsu Construction Co., Ltd. Its large-diameter bored tunnel is designed to accommodate two railway tracks in a single bore. The wider contract also includes a facility building and underground basements for electrical and mechanical services.
Project background: LTA announcement · Nishimatsu project announcement
Our equipment on site
Our central partition wall and top slab formwork trolley is shown here within the CR110 tunnel. This project reference highlights our equipment for internal concrete works in a large-diameter rail tunnel.