
Product rendering. Equipment configuration is project-specific.
LINING PREPARATION
Waterproofing & Rebar Trolleys
Configure membrane and reinforcement installation around the tunnel profile, working envelope and installation sequence.
DEFINE THE CONFIGURATIONBuilt around
Built around
your requirements.
Final dimensions, configuration and supply scope are confirmed in the project quotation.
01
Working platform and tunnel profile
02
Membrane deployment arrangement
03
Reinforcement handling requirements
04
Travel and control configuration
MAKE YOUR ENQUIRY MORE USEFULBring the details.
Bring the details.
We’ll start there.
- Tunnel profile and available clearance
- Membrane and reinforcement installation method
- Required working height and travel arrangement
Explore more equipment.
View the portfolio
PRODUCT RENDERINGCONCRETE LINING
Tunnel Lining Trolleys
Secondary lining formwork for your tunnel profile, pour length and construction sequence.
ILLUSTRATIVE RENDERINGBRIDGE CONSTRUCTION
Cantilever Bridge Construction Machine
Integrated formwork and working platforms for cast-in-place bridge segments.

TUNNEL SUPPORT
Wet-mix Shotcrete Machines
Mechanised wet-mix spraying for tunnel support operations.
