MODULAR SITE FACILITIES

Modular Containers & Cabins

From site offices and accommodation to equipment enclosures. Develop the container layout, internal fit-out and service interfaces around the way your site works.

Illustrative modular accommodation unit with a fitted interior
Modular accommodation concept. Product rendering from the manufacturer brochure.
THE PRODUCT

Useful space,
shaped around the site.

The manufacturer portfolio covers integrated modular buildings, flat-pack cabins and enclosures designed around installed equipment.

Site cabins can be combined horizontally or vertically to form a larger arrangement. Equipment enclosures are developed around the internal equipment, its fixing points and the required service access.

Flexible layouts
Discuss individual rooms or a combined cabin arrangement for offices, accommodation and other project spaces.
Internal fit-out
Define partitions, doors, windows and the electrical and ventilation scope for the intended use.
Equipment interfaces
Coordinate equipment dimensions, fixing and vibration-isolation requirements, openings and maintenance clearances.
CONFIGURATION OPTIONS

Three ways to configure the space.

Start with the application, then define the structure, fit-out and installation scope.

01

Flat-pack site cabins

Standard cabin modules combined to suit a site office, accommodation or camp arrangement.

02

Modular living spaces

Integrated room layouts for accommodation and custom-use spaces. Interior visuals are illustrative.

03

Equipment enclosures

Custom housings for installed systems. Brochure examples include generator and wastewater-treatment enclosures.

YOUR PROJECT BRIEF

Start with
the site requirements.

Dimensions, structural loads, stacking arrangements, insulation and fire requirements are defined for each project. Brochure images show reference configurations; installed equipment and site fit-out are subject to the agreed supply scope.

Prepare a product enquiryAsk on WhatsApp
01Application & layout
Office, accommodation or equipment enclosure; room schedule and a layout sketch.
02Dimensions & equipment
Available footprint, internal equipment dimensions, access and maintenance clearances.
03Structure & services
Project loads, stacking requirements, insulation, electrical supply and ventilation needs.
04Delivery & installation
Transport limits, lifting access, foundation interfaces and required project approvals.
Let’s talk